Announcement:
Announcement:

Some of the projects we have completed across Türkiye

We have 500+ completed and 10+ ongoing contracts for environmental and infrastructure projects.

Tüm Projeler (5 proje)

Sarıyer Kilyos Tunnel Waste Management and Septic Tank Cleaning Services

Sarıyer Kilyos Tunnel Waste Management and Septic Tank Cleaning Services

The Sarıyer-Kilyos Tunnel is a 6.875 km long, double-tube, four-lane highway tunnel connecting Çayırbaşı and Uskumruköy/Kilyos, aiming to alleviate traffic in northern Istanbul. The project, targeted to open at the end of 2026, will reduce travel time from 35 minutes to 5 minutes and is integrated with the Northern Marmara Highway.

İstanbul TÜRKİYE $300M
Detailed Information
Waste Management and Industrial Septic Tank Cleaning Services for Yavuz Sultan Selim Bridge

Waste Management and Industrial Septic Tank Cleaning Services for Yavuz Sultan Selim Bridge

This is the operational leadership of the YSS Bridge, one of the widest bridges in the world, which operates 24/7 and involves the maintenance of its drainage systems, liquid waste discharge, and solid waste management processes. During this process, environmental cleaning and infrastructure protection are ensured to high safety standards without disrupting bridge traffic.

İstanbul TÜRKİYE $7.1MR
Detailed Information
ISKI Septic Tank Cleaning Service for Infrastructure Works in Sarıyer and Beşiktaş Districts

ISKI Septic Tank Cleaning Service for Infrastructure Works in Sarıyer and Beşiktaş Districts

Infrastructure Works Between Sarıyer and Beşiktaş – This project includes cleaning, unclogging, and maintenance of sewage and rainwater lines in the region. The project encompasses the removal of accumulated waste from the lines using vacuum trucks, emptying of septic tanks and pumping stations, and addressing infrastructure problems requiring urgent intervention.

2019 İstanbul TÜRKİYE 200M₺
Detailed Information
KMO Sarıyer Tunnel Construction Project – Septic Tank Cleaning and Infrastructure Services

KMO Sarıyer Tunnel Construction Project – Septic Tank Cleaning and Infrastructure Services

Within the scope of the Northern Marmara Highway Sarıyer Tunnel construction project, sewer cleaning services were provided by Hitit Construction Mining as a subcontractor. During the project, professional sewer cleaning operations were carried out in the tunnel construction areas, worker gathering and rest areas, and administrative office areas to empty wastewater and septic systems, clean infrastructure, and ensure environmental hygiene.

İstanbul TÜRKİYE $300M
Detailed Information
Waste Management and Septic Tank Cleaning Service for Neva and Gardenia Residences | SEBA CONSTRUCTION INC.

Waste Management and Septic Tank Cleaning Service for Neva and Gardenia Residences | SEBA CONSTRUCTION INC.

SEBA İNŞAAT A.Ş. provided septic tank emptying services for the Seba Neva Konakları and Gardenia Konaklar projects, located in the Zekeriyaköy and Uskumruköy areas of Sarıyer, Istanbul. As part of the project, wastewater discharge, septic tank emptying, sewer cleaning, and infrastructure support operations were carried out using professional equipment.

2025 Sarıyer İSTANBUL $50M
Detailed Information

Subscribe to Our Newsletter

Be the first to hear about our projects and news

We are here with a brand new infrastructure and a modern interface

We are here with a brand new infrastructure and a modern interface

  • We're back with a brand new infrastructure and modern interface.
  • We're confident you'll find everything you're looking for in seconds.
  • But if you experience any problems, please don't hesitate to use the contact sections!
Bize WhatsApp'tan ulaşın